BACK

Swan 100-204

Nearing Completion

 

Deck on, hull painted, pedistals in place, center cockpit installed.

A superior hull paint job.

WInches are on, sheet tracks and cars in place.

Dingy garage is now complete sealed off from the other compartments.

Hydraulic passarell on starboard aft end.

Port pedistal. Mainsheet housing in place.

Starboard pedistal, cut outs for various panels outboard of pedistal.

 

 

A clear plastic film protects the deck.

Anchor locker, with LPG tank storage to port.

 

This is the air drive mechanism for the main hatch.

The on-deck refer will go here. The new hatch to Ygal's head is visible inside the opening.

 

The center cockpit. Ygal's cabin can be seen through the port side seat.

 

Center cockpit looking aft.

New hatch into Ygal's cabin.

Nav station. The upper left corner will be the housing for the refer.

 

Main salon port side.

 

Main salon stbd. side. The wook cabinet in the center of the photo is the housing for the refer.

Port aft guest stateroom.

 

The new hatch in Ygal's cabin!

 

Ygal's cabin looking forward.

 

Tomek's cabin.

 

Tomek's head.

Forward starboard guest cabin.

 

Guts of main control panel in galley. Engine room to left.

 

Engine room, starboard side. The sand filter for the watermaker is in the center of the photo.

 

Top of watermaker with hydraulic system in back.

 

Electrical panels.

Air Conditioning compressors.

Dual PTOs on generators.

Both high and low pressure air compressors.

Exhaust manifld for main engine and both generators.

Watermaker.

 

Port crew cabin.